Central Vacuum System for Pelletizer Building Floor Cleaning
PTT Global Chemical Public Company Limited, Thailand 2021
To Vacuum clean working area around Pelletizer building which is 4 levels 20m high at different working areas to ensure safe collection of dangerous material and protect the workers and enforce good housekeeping.
RUWAC SOLUTION:
-
DS2720 3 Phase ATEX Zone 1+2+21 II 2 D/G
-
D2 Silo Stand frame for big bag collection of the vacuum material
-
Additional Grounding for Silo and Big Bag
-
Throttle valve with pneumatic rotary actuator for collection of material in big bag
-
JACOB Powder coated steel piping
-
Remote Start / Stop control box at each suction points
-
Alarm for filter cleaning after each operation
TECHNICS:
-
2 x DS 2720 drive unit 7.5kw – Zone 1+2+21 II 2D/G
-
Silo pre-separator system with filter 4.5m2
-
Customized silo stand frame for big bag
-
Accessories DN50mm with accessories holder
-
Jacob piping system DN100mm made of Powder coated steel
-
6 Suction points operated only a maximum of 2 suction points at a time!
-
Manual shaking extension device for handshaking filter cleaning
-
Endcap on each floor
-
Control cabinet with digital text display shows status and malfunction
-
Remote start/stop by selector switch on each suction point
-
Continuous discharge with 2 x pneumatic valves open / close sequence adjustable timing.
-
Automatic piping cleaning valve function after stop operation.
-
Turbine temperature switch 112 C
-
Alarm timer to inform the operator to manually carry out filter shaking process – Filter differential pressure monitoring max 80mbar
-
Max vacuum pressure monitoring function
ADVANTAGES:
-
Workers are now better protected from exposure to harmful dust in working area.
-
Cleaning is efficient and safe and dust clouds are no longer formed by sweeping.
-
Cleaning time is greatly reduced with the easy use of accessories and hose at different suction points around the Palletizer building.
-
Easy access to a Vacuum solution to clean any spillage or dust on the floor.
-
Safety concerns such slip and falls are reduced due to cleaner floors.
-
Dangerous material is safely stored for easy disposal when full.
-
Workers no longer need to frequently touch or change filters.
-
Workers spend approximately 30 mins after each shift to clean work area compared to previous 2 hours, saving 75% of the time spend
-
Only 2 Workers required for cleaning, saving 50% of manpower.
-
Production time has been greatly improved.